I secured the cold water lines to the ceiling with cable ties. The PEX hose is not flexible so it took more ties than I wanted. I will need two more packages to finish off the hot water lines.
I picked up adapters to mate up the head discharge hoses. I am modifying the head intake fittings to eliminate a 90 degree bend--That needs a torch and a vise to remove the old part.
The two manifolds for hot and cold water are installed. I still need to shorten and connect the various lines. This should go fast, but I'll need to secure the hoses to the hull first.
I have an adapter to mate up to the deck shower, but have not yet tested it to see if it will fit. Once that is done, I can add pigtails to feed it and connect to the PEX serving that area.
While I am getting close, step by step, it is a tedious process finding the parts I need. For example I need to connect the sink drain and I can't find a part to connect to the large diameter sink drain. I found a replacement part, but it is all plastic and I know it will fail or get scratched up quickly. I'd rather make my stainless part mate up to something.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment