Here is another gap in the sole. The aft edge--top, was not supported enough. I cut this piece of plywood and tabbed it in flush with the floor. I wanted the floor bearing on the full 3/4" of plywood.
This picture shows several layers of fiberglass mat, with the top layer at an angle waiting to be ground off.
Tomorrow ill tab the other side and attach a cleat to support a floor panel.
The near side, not shown, needs a cleat bolted into support the third side of the drop in board. And I'll need to cut a board and cover it in fiberglass cloth to complete this section of floor.
No comments:
Post a Comment