Today I finished sanding, including some time consuming hand sanding, and I am ready to spray paint eight (8) boards and two (2) larger pieces.
My paint sprayer and working table:
Here they are ready to paint.
Paint with isocyanates involves at least two layers of clothing, one being a protective suit. Long paints tucked into sock and long sleeve shirt, mask, g cap, environmental suit on top with goggles holding the hood in place.
Actual spraying took 39 minutes. I spent more time prepping everything. With a littler Iuck, I can get a second coat on today.
No comments:
Post a Comment