Tuesday, July 16, 2013

Grinding Away

Starboard side settee bottom is pretty much done. I still have to paint this and it will be getting done teak trim. 


Meanwhile, I have been working aft grinding the lazarette and aft bulkhead area prepping for some tabbing. I ran out of sanding disks. I have more to do as I found a two bulkheads that need tabbing and the inside of one locker. I emptied more things off the boat to make it easier to clean and work.  I also need to grind the area under the port lazarette. 

I would dearly love to finish the grinding so I can overnight on the boat and save on the commuting.

I was unable to attach the hoses as I needed to heat them up to fit them over the tubes. That is my priority after I finish grinding tomorrow and vacuuming up the mess. 

I also need to stop by the machine shop to drill out my bronze tiller arm, and later this week the sheet metal guys to fabricate two galley counters, and a few other pieces.